|
LG Caltex Oil Co. |
LG Engineering |
Yeosu, Korea |
Toluene Column Reboiler for BT Extraction Project |
114 MMBtu/hr |
EPC |
2000 |
|
Suncor |
Bantrel |
Ft. McMurray, Canada |
Four Hydrotreater furnaces for Millenium project |
12.73, 37.76, 59.7, 24.85
MMBtu/hr |
EP |
2000 |
|
Suncor |
Bantrel |
Ft. McMurray, Canada |
2 Diluent Recovery furnaces with Steam Systems |
2 @ 87.8 MMBtu/hr each |
EP |
2000 |
|
Suncor |
Bantrel |
Ft. McMurray, Canada |
8 double fired coker furnaces with Steam Systems
for 100,000 BBL/day Coker unit |
504 MMBtu/hr |
EP |
2000 |
|
Valero |
KTI |
Paulsboro, NJ |
FCC Unit F.G. Cooler Revamp |
|
EPC |
1999 |
|
Enterprise Products |
KTI Fish |
Jacinto Port, Texas |
Regeneration Heater |
117 MMBtu/hr |
EP |
1999 |
|
Syncrude |
SNC |
Mildred Lake, Canada |
Vacuum furnace and APH system for 175,000 BBl/day unit
with future expansion to 305,000 BBl/day |
190 MMBtu/hr |
EP |
1999 |
|
Valero |
KTI |
Paulsboro, NJ |
PDA Heater Revamp |
10 MMBtu/hr |
EPC |
1999 |
|
Amoco |
KTI |
Texas City, Texas |
Steam Superheater / Hot Oil Heater Revamp |
220, 40 MMBtu/hr |
EPC |
1998 |
|
Chevron Chemical |
KTI |
St. James, Louisiana |
Steam Superheater for SM Unit |
175 MMBtu/hr |
EPC |
1998 |
|
CJSM |
MHI |
Jilin, China |
Styrene Steam Superheater |
48 MMBtu/hr |
EP |
1998 |
|
KVCM (Petronas/Mitsui JV) |
Toyo Engineering |
Kertih, Malaysia |
Two EDC Pyrolysis furnaces for
400,000 MTPY VCM Plant |
2 crackers @ 76 MMBtu/hr
Each |
EP |
1998 |
|
Lonza Singapore PTE Ltd. |
Toyo Engineering |
Pulua Sakra, Singapore |
Raffinate Reboiler w/APH
Charge Heater for PIA Project |
68 MMBtu/hr
4 MMBtu/hr |
EP |
1998 |
|
Oildale Energy |
KTI |
Bakersfield, California |
Heater |
75 MMBtu/hr |
EPC |
1998 |
|
Petrobras |
Toyo Engineering |
Brazil |
Thermal Oil Heater |
40 MMBtu/hr |
EP |
1998 |