INNOVARE KTI

Reference

Total 425 The thing is 21 Page
Reference List
KTI PROJECT LIST
CLIENT CONTRACTOR PLANT LOCATION APPLICATION DUTY / CAPACITY SCOPE YEAR OF
COMPLETION
JE Merit / Koch KTI Corpus Christi, TX Crude Heater Vacuum Heater 286 MMBtu/Hr
80.5 MMBtu/Hr
C 1993
KTI SpA / Petron KTI SpA Bataan, Philippines Crude Oil Furnace 150 MMBtu/Hr EPC 1993
Marathon KTI Garyville, LA Revamp UOP Platformer 320 MMBtu/hr EPC 1993
Marathon Oil KTI Garyville, LA Revamp Two Alkylation Heaters 246 MMBtu/hr EPC 1993
MHI/VPM MHI Venezuela Reformer 2500 TPD EP 1993
Monsanto KTI Muskatine, IA Retube/Revamp Acetic Acid Cracker EPC 1993
Esso Sriracha FWEL Sriracha, Thailand Vacuum Furnace 99.21 MM Btu/hr EPC 1992
Esso Sriracha FWEL Sriracha, Thailand High Intensity Crude Furnace 208.35 MM Btu/hr EPC 1992
National Methanol Fluor National Methanol Fluor Al Jubail, Saudi Arabia Catofin Process Charger Heater 178 EP 1993
Nat'l Nigerian Petroleum Corp. Chiyoda Port Harcort, Nigeria Hot Oil Furnace 30 MMBtu/hr EPS 1993
Oxymar KTI Ingleside, TX Rebuild EDC Cracker 60 MMBtu/hr EPC 1993
Southwest Refining KTI Corpus Christi, TX Revamp Cat Reformer EPC 1993
Texaco KTI El Dorado, KS Hydrogen Plant Reformer 8 MMSCFD S 1993
Tosco (APCI) KTI Martinez, CA Hydrogen Plant Reformer 25/35 MMSCFD EPC 1993
Confidential Badger Corpus Christi, TX Crude and Diesel Stripper Heaters with Common APH 312/26 MMBtu/hr EP 1992

Search